Skip to content

Air Emission Permitting

Location: Cambridge, Ontario
Client: Cambridge Rigging
Date: 2018

AET prepared an abatement plan for Cambridge Rigging that outlined the actions to be taken to address the approval/registration requirements for air emissions. AET worked with Airzone One to prepare this environmental approval, including assessing all site discharges under O. Reg. 419/05 and generally assist the facility to compile and submit an appropriate registration to the MOECP. The scope of work included a site visit to the facility, emission estimates for substances emitted from the facility, modelling of air emissions for substances emitted from the facility, preparing a dispersion model and impact assessment report, preparing an ESDM Report, preparing an odour screening report, assisting with preparing operating/maintenance/monitoring procedures, and submission of registration to the EASR.