Back to Projects

GHG Emission Inventory Verification

AET conducted the verification (limited level of assurance) for the Regional Municipality of Waterloo’s community GHG inventory that was prepared to meet the community requirements of PCP Milestone 1. The verification project required AET to thoroughly review the Region’s community inventory for data accuracy, data quality, and conformance with both the PCP program and the International Local Government GHG Emission Analysis Protocol.

Location: Kitchener, ON
Client: Regional Municipality of Waterloo
Date: 2012